Print This Page Print This Page Icon

Change Process

The purpose of the Change Process is to maintain the integrity and robustness of the Code Subsidiary Documents, Balancing and Settlement Code (BSC) Systems and other Configurable Items and to ensure that all changes are introduced in a controlled and auditable manner.

This is achieved by:

  • Implementing the Change Management Procedures within the BSC;
  • Assessing all proposed changes and assisting the Panel Committees in making informed decisions;
  • Implementing new, or revisions to existing, products; and
  • Producing Baseline Statements

Details of the Change Process can be found within PDF Icon BSCP40 (204Kb) .

For an overview of the Change Process refer to the related link alongside. Select an option from the table below or from the options on the left to view Change Process documents.

SectionDescription
Change ProposalsKey documentation relating to all Change Proposals (CPs). This section also includes guidance information on submitting a CP and the submission form.
Draft Change ProposalsKey documentation relating to all Draft Change Proposals (DCPs). This section also includes guidance information on submitting a DCP and the submission form.
IssuesKey documentation relating to all issues. This section also includes guidance information on submitting an issue and the submission form.
Assessment and TimetablingContains details regarding Change Proposal Circulars (CPCs), batching timetable and Impact Matrices
Change Proposal CircularsContains all of the CPCs issued by ELEXON
Progress ReportsIncludes the Change Report, Change Register, the Release Plan and the Baseline statement
Conformed Category 1 DocumentsConformed Documents are Code Subsidiary Documents that include approved redlined changes for Change Proposals and/or Modifications that are awaiting implementation
Registered office: 4th Floor 350 Euston Road London NW1 3AW   Reg Co No: 3782949 Registered in England and Wales