Historical Codes of Practice

Refer to the table below to download a historical version of the metering Code of Practice in PDF format.

Notify me when a document is added/updated to this table Notify me when a document is added/updated to this table
CoPsIssueVersionEffective dateTitle Documents to add to basket Notifying of updated documents
111.00Code Effective DateCode of Practice 1 for the Metering of Circuits with a Rated Capacity Exceeding 100MVA for Settlement (458Kb)
112.0BETTA Effective DateCode of Practice 1 for the Metering of Circuits with a Rated Capacity Exceeding 100MVA for Settlement (460Kb)
123.023/02/2006Code of Practice 1 for the Metering of Circuits with a Rated Capacity Exceeding 100MVA for Settlement Purposes (503Kb)
124.006/11/2008Code of Practice 1 for the Metering of Circuits with a Rated Capacity Exceeding 100MVA for Settlement Purposes (544Kb)
125.025/06/2009Code of Practice 1 for the Metering of Circuits with a Rated Capacity Exceeding 100MVA for Settlement Purposes (546Kb)
126.020/11/2009 Code of Practice 1 for the Metering of Circuits with a Rated Capacity Exceeding 100MVA for Settlement Purposes (601Kb)
127.026/11/2009 Code of Practice 1 - The Metering of Circuits with a Rated Capacity Exceeding 100MVA for Settlement Purposes (119Kb)
211.0015/04/93Code of Practice 2 for the Metering of Circuits with a Rated Capacity not exceeding 100 MVA for Settlement Purposes (1.4Mb)
221.0301/05/97Code of Practice 2 for the Metering of Circuits with a Rated Capacity not exceeding 100 MVA for Settlement Purposes (1.2Mb)
231.05Code Effective DateCode of Practice 2 for the Metering of Circuits with a Rated Capacity not exceeding 100 MVA for Settlement Purposes (470Kb)
232.0BETTA Effective DateCode of Practice 2 for the Metering of Circuits with a Rated Capacity not exceeding 100 MVA for Settlement Purposes (477Kb)
243.023/02/2006Code of Practice 2 for the Metering of Circuits with a Rated Capacity not exceeding 100 MVA for Settlement Purposes (449Kb)
244.006/11/2008Code of Practice 2 for the Metering of Circuits with a Rated Capacity not exceeding 100 MVA for Settlement Purposes (500Kb)
245.025/06/2009Code of Practice 2 for the Metering of Circuits with a Rated Capacity not Exceeding 100 MVA for Settlement Purposes (578Kb)
246.005/11/2009Code of Practice 2 for the Metering of Circuits with a Rated Capacity not Exceeding 100 MVA for Settlement Purposes (583Kb)
247.020/11/2009 Code of Practice 2 for the Metering of Circuits with a Rated Capacity not Exceeding 100 MVA for Settlement Purposes (581Kb)
248.026/11/2009 Code of Practice 2 - The Metering of Circuits with a Rated Capacity not Exceeding 100 MVA for Settlement Purposes (116Kb)
311.0015/04/93Code of Practice 3 for the Metering of Circuits with a Rated Capacity not exceeding 10 MVA for Settlement Purposes (1.4Mb)
322.0008/09/95Code of Practice 3 for the Metering of Circuits with a Rated Capacity not exceeding 10 MVA for Settlement Purposes (1.3Mb)
332.0301/05/97Code of Practice 3 for the Metering of Circuits with a Rated Capacity not exceeding 10 MVA for Settlement Purposes (307Kb)
342.051998 Operational DateCode of Practice 3 for the Metering of Circuits with a Rated Capacity not exceeding 10 MVA for Settlement Purposes (1.6Mb)
353.00Code Effective DateCode of Practice 3 for the Metering of Circuits with a Rated Capacity not exceeding 10 MVA for Settlement Purposes (273Kb)
354.0BETTA Effective DateCode of Practice 3 for the Metering of Circuits with a Rated Capacity not exceeding 10 MVA for Settlement Purposes (500Kb)
355.0 03/11/2005Code of Practice 3 for the Metering of Circuits with a Rated Capacity not exceeding 10 MVA for Settlement Purposes (543Kb)
356.006/11/2008Code of Practice 3 for the Metering of Circuits with a Rated Capacity not exceeding 10 MVA for Settlement Purposes (542Kb)
357.025/06/2009Code of Practice 3 for the Metering of Circuits with a Rated Capacity not Exceeding 10 MVA for Settlement Purposes (544Kb)
358.020/11/2009 Code of Practice 3 for the Metering of Circuits with a Rated Capacity not Exceeding 10 MVA for Settlement Purposes (555Kb)
41None19/03/92Code of Practice 4 for the Calibration and Testing Requirements for Metering Equipment Registered with the Pooling and Settlement Administrator (766Kb)
421.0015/04/93Code of Practice 4 for the Calibration, Testing and Commissioning Requirements of Metering Equipment for Settlement Purposes (1.4Mb)
431.1126/07/94Code of Practice 4 for the Calibration, Testing and Commissioning Requirements of Metering Equipment for Settlement Purposes (1.3Mb)
442.0008/06/95Code of Practice 4 for the Calibration, Testing and Commissioning Requirements of Metering Equipment for Settlement Purposes (1.3Mb)
453.00Code Effective DateCode of Practice 4 for the Calibration, Testing and Commissioning Requirements of Metering Equipment for Settlement Purposes (409Kb)
454.0 BETTA Effective DateCode of Practice 4 for the Calibration, Testing and Commissioning Requirements of Metering Equipment for Settlement Purposes (427Kb)
465.006/11/2008Code of Practice 4 for the Calibration, Testing and Commissioning Requirements of Metering Equipment for Settlement Purposes (614Kb)
466.026/02/2009Code of Practice 4 for the Calibration, Testing and Commissioning Requirements of Metering Equipment for Settlement Purposes (613Kb)
467.005/11/2009Code of Practice 4 for the Calibration, Testing and Commissioning Requirements of Metering Equipment for Settlement Purposes (637Kb)
511.0004/12/92Code of Practice 5 for the Metering of Energy Transfers with a Maximum Demand of up to (and including) 1MW Covered by the Pooling and Settlement Agreement (1.3Mb)
521.0313/09/94Code of Practice 5 for the Metering of Energy Transfers with a Maximum Demand of up to (and including) 1MW Covered by the Pooling and Settlement Agreement (1.3Mb)
531.0420/03/96Code of Practice 5 for the Metering of Energy Transfers with a Maximum Demand of up to (and including) 1MW Covered by the Pooling and Settlement Agreement (1.3Mb)
541.0606/11/2002Code of Practice 5 for the Metering of Energy Transfers with a Maximum Demand of up to (and including) 1MW Covered by the Pooling and Settlement Agreement (1.4Mb)
551.121998 Operational DateCode of Practice 5 for the Metering of Energy Transfers with a Maximum Demand of up to (and including) 1MW Covered by the Pooling and Settlement Agreement (1.6Mb)
562.00Code Effective DateCode of Practice 5 for the Metering of Energy Transfers with Maximum Demand of up to (and including) 1MW for Settlement Purposes (508Kb)
563.0BETTA Effective DateCode of Practice 5 for the Metering of Energy Transfers with Maximum Demand of up to (and including) 1MW for Settlement Purposes (513Kb)
564.0 03/11/2005Code of Practice 5 for the Metering of Energy Transfers with Maximum Demand of up to (and including) 1MW for Settlement Purposes (496Kb)
565.028/02/2008Code of Practice 5 for the Metering of Energy Transfers with Maximum Demand of up to (and including) 1MW for Settlement Purposes (525Kb)
566.006/11/2008Code of Practice 5 for the Metering of Energy Transfers with Maximum Demand of up to (and including) 1MW for Settlement Purposes (517Kb)
567.025/06/2009Code of Practice 5 for the Metering of Energy Transfers with Maximum Demand of up to (and including) 1MW for Settlement Purposes (547Kb)
568.020/11/2009 Code of Practice 5 for the Metering of Energy Transfers with Maximum Demand of up to (and including) 1MW for Settlement Purposes (555Kb)
569.026/11/2009 Code of Practice 5 for the Metering of Energy Transfers with Maximum Demand of up to (and including) 1MW for Settlement Purposes (698Kb)
613.0029/01/96Code of Practice 6 for the Metering of Energy Imports via Low Voltage Circuits Fused at 100 AMPS or Less per Phase for Settlement Purposes (3.7Mb)
623.1018/11/96Code of Practice 6 for the Metering of Energy Imports via Low Voltage Circuits Fused at 100 AMPS or Less per Phase for Settlement Purposes (3.5Mb)
634.1022/01/98Code of Practice 6 for the Metering of Energy Imports via Low Voltage Circuits Fused at 100 AMPS or Less per Phase for Settlement Purposes (3.8Mb)
644.20Code Effective DateCode of Practice 6 for the Metering of Energy Imports via Low Voltage Circuits Fused at 100 AMPS or Less per Phase for Settlement Purposes (564Kb)
645.0BETTA Effective DateCode of Practice 6 for the Metering of Energy Imports via Low Voltage Circuits Fused at 100 AMPS or Less per Phase for Settlement Purposes (563Kb)
646.006/11/2008Code of Practice 6 for the Metering of Energy Imports via Low Voltage Circuits Fused at 100 AMPS or Less per Phase for Settlement Purposes (550Kb)
647.025/06/2009Code of Practice 6 for the Metering of Energy Imports via Low Voltage Circuits Fused at 100 AMPS or Less per Phase for Settlement Purposes (628Kb)
713.0013/02/1996Code of Practice 7 for the Metering of Energy Imports Via Low Voltage Circuits Fused at 100 AMPS or Less per Phase for Settlement Purposes (2.8Mb)
723.10Code Effective DateCode of Practice 7 for the Metering of Energy Imports Via Low Voltage Circuits Fused at 100 AMPS or Less per Phase for Settlement Purposes (508Kb)
724.0 BETTA Effective DateCode of Practice 7 for the Metering of Energy Imports Via Low Voltage Circuits Fused at 100 AMPS or Less per Phase for Settlement Purposes (532Kb)
725.025/06/2009Code of Practice 7 for the Metering of Energy Imports Via Low Voltage Circuits Fused at 100 AMPS or Less per Phase for Settlement Purposes (537Kb)
811.0001/04/2003Code of Practice 8 for the Metering Import Active Energy via Low Voltage Circuits for Non-Half Hourly Settlement Purposes (474Kb)
812.0BETTA Effective DateCode of Practice 8 for the Metering Import Active Energy via Low Voltage Circuits for Non-Half Hourly Settlement Purposes (473Kb)
813.003/11/2005Code of Practice 8 for the Metering Import Active Energy via Low Voltage Circuits for Non-Half Hourly Settlement Purposes (477Kb)
814.023/08/2007Code of Practice 8 for the Metering Import Active Energy via Low Voltage Circuits for Non-Half Hourly Settlement Purposes (480Kb)
815.026/02/2009Code of Practice 8 for the Metering Import Active Energy via Low Voltage Circuits for Non-Half Hourly Settlement Purposes (508Kb)
911.0001/04/2004Code of Practice 9 for the Metering of Import and Export Active Energy via Low Voltage Circuits for Non-Half Hourly Settlment Purposes (503Kb)
912.0BETTA Effective DateCode of Practice 9 for the Metering of Import and Export Active Energy via Low Voltage Circuits for Non-Half Hourly Settlment Purposes (504Kb)
913.023/08/2007Code of Practice 9 for the Metering of Import and Export Active Energy via Low Voltage Circuits for Non-Half Hourly Settlment Purposes (513Kb)
914.026/02/2009Code of Practice 9 for the Metering of Import and Export Active Energy via Low Voltage Circuits for Non-Half Hourly Settlment Purposes (534Kb)
1011.026/02/2009Code of Practice 10 for the Whole Current Metering of Energy via Low Voltage Circuits for Settlement Purposes (385Kb)
1022.025/06/2009Code of Practice 10 for the Metering of Energy via Low Voltage Circuits for Settlement Purposes (404Kb)
1023.005/11/2009Code of Practice 10 for the Metering of Energy via Low Voltage Circuits for Settlement Purposes (396Kb)
1024.020/11/2009 Code of Practice 10 for the Metering of Energy via Low Voltage Circuits for Settlement Purposes (401Kb)
1025.026/11/2009 Code of Practice Ten for the Metering of Energy via Low Voltage Circuits for Settlement Purposes (471Kb)
ANoneNone30/03/90CoPA for the Metering of Electricity Transfers between National Grid Company plc and Public Electricity Suppliers using the National Interim Metering Scheme (7.9Mb)
BNoneNone 30/03/90CoPB for the Metering of Electricity Transfers between National Grid Company plc and Public Electricity Suppliers using the National Metering System at commercial boundaries (known as the "Final Metering Scheme") (9Mb)
CNoneNone30/03/90CoPC for the Metering of Electricity Transfers between Public Electricity Suppliers at Voltage Levels below 132kv (to apply after the Final Metering Scheme date) (7.8Mb)
DNoneNone30/03/90CoPD for the Metering of Electricity Transfers between National Grid Company plc and Generating Companies using the National Interim Metering Scheme (7.8Mb)
ENoneNone30/03/90CoPE for the Metering of Electricity Transfers between National Grid Company plc and Generating Companies using the National Final Metering Scheme (7.6Mb)
FNoneNone30/03/90CoPF for the Metering of Electricity Transfers between Embedded Generators and Public Electricity Suppliers (7.6Mb)
GNoneNone30/03/90CoPG for the Metering Second Tier Supplies of 1MW and Above (6.5Mb)
HNoneNone30/03/90CoPH for the Metering of Electricity Transfers between National Grid Company plc and Externally Interconnected Parties over Alternating Current Interconnections using the National Interim Metering Scheme (6.4Mb)
INoneNone30/03/90CoPI for the Metering of Electricity Transfers between National Grid Company plc and Externally Interconnected Parties over direct Current Interconnections, using the National Interim Metering Scheme (5Mb)
JNoneNone30/03/90CoPJ for the Metering of Electricity Transfers between National Grid Company plc and Externally Interconnected Parties over Alternating Current Interconnections using the National Final Metering Scheme (6Mb)
K1NoneNone13/06/91CoPK1 for the Metering of Electricity Transfers between National Grid Company plc and Existing Non-Embedded Direct Consumers using the National Metering Scheme at commercial boundaries (known as the "Final Metering Scheme") (7.2Mb)
K2NoneNone13/06/91CoPK2 for the Metering of Electricity Transfers between National Grid Company plc and Non-Embedded Consumers using the National Metering Scheme at commercial boundaries (known as "Final Metering Scheme") (9.8Mb)

Codes of Practice - Settlement Agreement for Scotland

The Codes of Practice are in relation to the Settlement Agreement for Scotland ("SAS"). ELEXON Limited is not responsible for the creation of the SAS Codes of Practice. While care is taken in the collection and provision of this information, ELEXON Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from use of this information or action taken in reliance on it.

In accordance with Section L of the BSC; a Metering System shall, as a minimum, comply with the requirements set out in the version of the Code of Practice relevant at the time the Metering System was first registered for Settlement.

Refer to the table below to download a Code of Practice in PDF format. Go to the Codes of Practice page for more information about the Technical Assurance of Half Hourly Settlement Metering Systems, the National Measurement Transformer Error Statement and metering dispensations.

Notify me when a document is added/updated to this table Notify me when a document is added/updated to this table
CoPsIssueVersionEffective dateTitle Documents to add to basket Notifying of updated documents
S1122.031/10/2005Scottish S1 - Code of the Metering of Circuits with a rated capacity exceeding 100 MVA for Allocation purposes (397Kb)
S2122.031/10/2005Scottish S2 - Code of the Metering of Circuits with a rated capacity not exceeding 100 MVA for Allocation purposes (429Kb)
S3122.031/10/2005Scottish S3 - Code of the Metering of Circuits with a rated capacity not exceeding 10 MVA (428Kb)
S4122.031/10/2005Scottish S4 - Code for the calibration, testing and commissioning requirements of Metering Equipment for Allocation purposes (428Kb)
S5122.031/10/2005Scottish S5 - Code for the Metering of Circuits with a rated capacity not exceeding 1MW for Allocation purposes (212Kb)
S6122.031/10/2005Scottish S6 - Code for the Metering of Energy Imports via Low Voltage Circuits at 100 Amps or less per phase for Allocation purposes (529Kb)
S7122.031/10/2005Scottish S7 - Code for the Metering of Energy Imports via Low Voltage Circuits at 100 Amps or less per phase for Allocation purposes (694Kb)
S8122.031/10/2005Scottish S8 - Code of the Metering of Import Active Energy via Low Voltage Circuits for Non Half Hourly Allocation purposes (409Kb)
Registered office: 4th Floor 350 Euston Road London NW1 3AW   Reg Co No: 3782949 Registered in England and Wales