Advanced search
Home > About Us > Corporate & Financial Information > Quarterly Report > Quarterly Report - Governance and Change
Modifications
3 new Modification Proposals were raised:P279 – Correcting the BSC description of the CDCA to SVAA interface for GSP Group net ExportP280 - Introduction of new Measurement ClassesP281 - Change of BSC Co Board of Directors & Chairman
0 Modification Proposals were withdrawn.
0 Modification Proposals were submitted to the Authority for decision.
0 Modification Proposals were approved by the Authority.
1 Modification Proposal was approved by the BSC Panel as a Self-Governance Modification:P279 – Correcting the BSC description of the CDCA to SVAA interface for GSP Group net Export
2 Modification Proposals were rejected by the Authority:P270 - The Application of Line Loss Factors to GSPs that are not Transmission-interconnectedP271 - NETSO Consultation in relation to any potential changes to the BSC which takes place in forums other than the BSC Panel
0 Modification Proposals were pending Authority decision at 31 December 2011.
1 Modification Proposal was implemented:P253 - Improving the accuracy of the credit calculation for SVA participants
5 Modification Proposals were pending implementation as at 31 December 2011:P266 – Improving the allocation of Reactive Power flows between Import and Export Metering SystemsP268 – Clarify the P/C status process for exempt BM UnitsP269 – Prevention of Base Trading Unit BMUs’ Account Status Flipping from Consumption to Production (the “Flipping” mod)P273 - Make the SVA Funding Share calculation robust to changes in Scaling WeightsP279 – Correcting the BSC description of the CDCA to SVAA interface for GSP Group net Export
Change Proposals:
10 new Change Proposals were raised:CP1357 – Correction to MSID Allocation ProcessCP1358 – Change to timeband weightings in the Market Index Definition Statement CP1359 – Introducing new products into the Market Index Definition StatementCP1360 – Inclusion of Audit Records for Gross Volume Correction and Dummy Meter ExchangesCP1361 – Removal of Extreme EACsCP1362 – Removal of Residual Negative EACsCP1363 – Addressing Settlement Data Adjustments in a Balanced MannerCP1364 – Remove BSC Systems constraint on maximum negative CALF valuesCP1365 – Shortening Profile Production TimescalesCP1366 – Data Quality Obligations for Outgoing Supplier Agents
4 Change Proposals were implemented:CP1334 – New PARMS SerialsCP1335 – Mandating use of Auxiliary Meter Technical Details Data flowCP1346 – Proving tests shall not be based on verbal Meter Technical DetailsCP1345 – Migration of interface between National Grid and BMRA/SAA/ECVAA from CSV to XML file format
11 Change Proposals were pending implementation as at 31 December 2011:CP1347 – Enhancements to SVAA Process for Distribution of Consumption Data for Embedded NetworksCP1349 – Changes to accommodate EU metering standardsCP1350 – Clarifying Meter Technical Details relating to Metering Systems that can be read remotelyCP1352 – Remove option of postal FAA invoicesCP1353 – Including the ECOES Meter Information flow (D0312) in BSCP514CP1354 – Clarifying commissioning requirements of BSCP537 Qualification Appendix 1: Self Assessment Document (SAD)CP1355 – Update to BSCP537 Qualification Appendix 2: Testing RequirementsCP1356 – Demand BM Unit Aggregation Rule Example for BSCP75CP1357 – Correction to MSID Allocation ProcessCP1358 – Change to timeband weightings in the Market Index Definition StatementCP1359 – Introducing new products into the Market Index Definition Statement
BSCP40 issues:No BSCP40 issues were raised or remain open during this period (as at 31 December 2011).
Standing Issues:new Standing Issue were raised during this period.
1 Standing Issue remained open (as at 31 December 2011):Issue 43 - On-site Generation during Planned Outages
1 Standing Issue was closed during this period.Issue 41 – Improving the Speed and Accuracy of Data Flows
BSC Panel and Committee Activity: As well as considering the Modifications in the section above, the Panel:
Imbalance Settlement Group (ISG):The ISG continues to oversee and contribute to the development of the CVA arrangements. Decisions included:
Supplier Volume Allocation Group (SVG):The SVG continues to oversee and contribute to the development of the SVA arrangements. Decisions included:
Trading Disputes Committee (TDC):Apart from its normal work the TDC:
Performance Assurance Board (PAB):Apart from its normal work, the PAB:
November 2011 ReleaseThe November 2011 Release was implemented on Thursday 3 November. It included one new Modification and five Change Proposals It delivered the new Supplier Volume Allocation (SVA) Interim Information (II) Volume Allocation Run (VAR). The Release also changed the BMRA Website to provide more accurate data on the Market View page. There are also new versions of several Code Subsidiary Documents and other Configurable Items for approved Change Proposals in the Release. Change Proposal Circular CC00703 issued on Wednesday 26 October gives full details of the Release.